The process

How It Works

Four clear steps from your first enquiry to a commissioned system — with no obligation until you accept a written quote.
A man in safety glasses installs a solar panel on a house roof, promoting renewable energy

Quick answer

The process has four steps: you enquire with your postcode and interest, we arrange a no-obligation survey, you receive a written quote with system design and costs, and then our MCS-certified installer partner installs and commissions the system. You are under no obligation until you accept the written quote.

Step by step

From enquiry to warm home

  1. 01

    Enquiry

    Tell us what you're interested in and your postcode. We'll match you with the right MCS-certified installer partner for your area.

  2. 02

    No-obligation survey

    A qualified surveyor visits your property to assess roof, heating system, insulation and electrical setup — no obligation.

  3. 03

    Design & written quote

    You receive a system design with generation figures and costs based on your actual property — confirmed on your written quote.

  4. 04

    Install & handover

    Our MCS-certified partner installs the system, handles DNO notification (G98/G99), commissions it and hands over the pack.

Row of harled semi-detached Scottish homes, two with solar panels on the roof, after rain

Your survey

What the survey looks at

  • Your roof — orientation, shading, structure and covering, for solar panels.
  • Your heating — current boiler, radiators, hot water and a heat loss assessment, for heat pumps.
  • Your electrics — consumer unit, meter position and space for an inverter or battery.
  • Your usage — how and when you use energy, so the system is sized for you.

What you receive

Clear paperwork at every stage

  • Honest advice

    Including when something is not worth doing for your home.

  • Written quote

    Warranty and guarantee terms are confirmed in writing on your quotation.

  • Paying for it

    Interest-free credit up to £30,000, subject to status.

  • Handover pack

    Commissioning records and system information when the work is complete.

Key facts for Scotland

Key facts for Scotland

Last updated: 28 October 2026

  • The process has four steps: enquiry, survey, written quote, and installation.
  • The survey is free and carries no obligation — you only pay if you accept the written quote.
  • A heat loss survey checks your insulation and radiators before a heat pump is recommended.
  • Your installer partner handles DNO notification (G98/G99) so you do not contact the network operator.
  • You receive a handover pack with commissioning records and warranty documentation.
  • We install through MCS-certified partners.

The process

How the installation process works

From enquiry to installation typically takes 4 to 8 weeks depending on survey availability, your decision time, and installer scheduling. The survey itself takes about 1 to 2 hours. Installation is usually completed in 2 to 4 days for a combined solar and heat pump system.

No. The survey is completely free and carries no obligation. You only pay if you accept the written quote and proceed with the installation. The surveyor assesses your property and provides honest advice, including telling you if a system is not right for your home.

The surveyor checks your roof orientation, shading and structure for solar panels, your current heating system, radiators and insulation for a heat pump, your consumer unit and meter position for electrical work, and your energy usage patterns. This is a room-by-room assessment, not a quick look.

The installer partner handles all DNO notifications (G98 or G99) on your behalf. In Scotland, your DNO is either SP Energy Networks or SSEN depending on where you live. You do not need to contact them yourself.

At handover you receive a commissioning record, system performance information, warranty and guarantee documents, and user instructions for your new equipment. Everything is confirmed in writing so you have a complete record of what was installed.

No. You are under no obligation at any stage until you accept a written quote. You can enquire, have the survey, receive the quote, and decide not to proceed. There is no cost and no pressure.

Last updated: 28 October 2026 · Reviewed by the Scottish Energy Efficiency team