Jargon buster
Glossary

Quick answer
This glossary explains the technical terms you will encounter when considering solar panels, battery storage or an air source heat pump in Scotland — from MCS and SEG to DNO, G98/G99, kWp and heat loss surveys. Definitions are in plain English, no jargon.
- MCS
- The Microgeneration Certification Scheme — a quality scheme for small-scale renewable installations such as solar panels, batteries and heat pumps. We install through MCS-certified partners.
- SEG
- The Smart Export Guarantee — payments for electricity you export to the grid, with rates set by each supplier.
- DNO
- Distribution Network Operator — the company that runs the local electricity network. In Scotland this is SP Energy Networks or SSEN, depending on where you live.
- G98 / G99
- The notification and application processes used to tell your DNO about generation equipment such as solar panels and batteries. Your installer partner handles this.
- kWp
- Kilowatt peak — the rated output of a solar array under standard test conditions. Real-world output varies with weather, season, orientation and shading.
- kWh
- Kilowatt hour — the unit of energy shown on your electricity bill, and used to describe battery capacity.
- EPC
- Energy Performance Certificate — a document showing a property’s energy efficiency, with recommendations for improvement.
- Inverter
- The device that converts the direct current from solar panels or a battery into alternating current your home can use.
- Heat loss survey
- A room-by-room calculation of how much heat your home loses, used to size a heat pump and check your radiators.
- Flow temperature
- The temperature of the water sent around your radiators. Heat pumps work most efficiently at lower flow temperatures.
- Permitted development
- Planning rights that let some works go ahead without a full planning application, as long as conditions are met. Always check with your local council.
Jargon buster
Questions about industry terms
kWp (kilowatt peak) is the rated output of a solar array under standard test conditions — it describes the size of the panels. kWh (kilowatt hour) is a unit of energy — it describes how much electricity the panels actually produce or how much a battery stores. Your electricity bill is measured in kWh.
MCS (Microgeneration Certification Scheme) is a quality scheme for renewable installations. If your system is installed by an MCS-certified partner, it meets recognised standards and you may be eligible for the Smart Export Guarantee (SEG) payments for electricity you export to the grid.
No. Your installer partner handles all DNO notifications (G98 or G99) on your behalf. In Scotland, your DNO is either SP Energy Networks or SSEN depending on where you live. The notification or application is part of the installation process.
A heat loss survey is a room-by-room calculation of how much heat your home loses through walls, windows, roofs and floors. It tells the installer what size heat pump you need and whether your radiators are adequate. Without it, a heat pump cannot be correctly sized.
The SEG is a government scheme that pays you for electricity you export to the grid from your solar panels. Rates are set by each electricity supplier, so it is worth comparing. Your installer partner can explain how SEG works with your system.
Permitted development allows some installations, like solar panels, to go ahead without a full planning application if conditions are met. Rules differ in conservation areas and for listed buildings. Always check with your local council before proceeding.
Last updated: 28 October 2026 · Reviewed by the Scottish Energy Efficiency team