Local guidance

Area Guides

Notes on local housing, network operators and planning for solar and heat pumps in different parts of Scotland.

Last updated: 28 October 2026 · Reviewed by the Scottish Energy Efficiency team

Beautiful panoramic view of rolling hills and yellow gorse in the Scottish countryside under a blue sky

Quick answer

We connect homeowners across Scotland with MCS-certified installer partners for solar panels, battery storage and air source heat pumps. Our area guides cover local housing, network operators and planning notes for Glasgow, Edinburgh and Aberdeen.

Key facts for Scotland

Key facts for Scotland

Last updated: 28 October 2026

  • Scotland has two distribution network operators: SP Energy Networks (central belt and south) and SSEN (north and Grampian).
  • Solar and battery installations require DNO notification (G98/G99), handled by your installer partner.
  • Many Scottish homes — sandstone tenements, granite cottages and rural properties — need specific checks on roof access, structure and planning.
  • Listed buildings and conservation areas may need planning permission before solar panels or a heat pump can be installed.

Area guides

Common questions about installation across Scotland

Yes, our MCS-certified installer partners cover all of Scotland, from the central belt to the Highlands and Islands. We have area guides for Glasgow, Edinburgh, Aberdeen, Dundee, Perth, Stirling, Inverness and the Highlands and Islands. Contact us with your postcode to confirm coverage.

Yes. Scotland has two DNOs: SP Energy Networks and SSEN. Your installer partner handles the DNO notification (G98/G99) for your area, so you do not need to contact them yourself. The process is included as part of your installation.

It can be possible, but tenement flats usually need extra checks on roof access, ownership and planning. Your installer partner assesses the roof during the survey and advises honestly. Check with your local council and factor or building owner before proceeding.

Last updated: 28 October 2026 · Reviewed by the Scottish Energy Efficiency team